SOC 2 Audit Cost and Timeline: A Realistic Budget
SOC 2 audit cost has no standard price, but it has a predictable structure. Typical first-year ranges by cost driver, plus the timeline from decision to issued report.
By Trustalis Published Last updated
The short answer
There is no standard price for a SOC 2 audit. For a small or mid-sized SaaS company, a first Type 2 commonly lands between roughly $27,000 and $110,000 in year one, across readiness work, the CPA firm's fee, tooling and internal time. Renewals cost materially less because the program already exists. Put the four drivers on the board slide, not the total.
The rest of this page gives you the structure to build your own number.
What you are buying, in the order you buy it
- Readiness. Gap assessment, control design, policy set, and technical remediation. Usually before anything else.
- The observation period. Controls operate while evidence accumulates. This is calendar time, not consultant time, and it is the line that decides your dates.
- Fieldwork and the report. The CPA firm tests samples, drafts the report, resolves exceptions, issues the opinion.
- Renewal. The same cycle again next year, with the program already standing.
Only two of those four are invoices from an auditor. Founders who budget only for the audit fee are the ones who run out of money in month three.
If you have not yet decided between the two report types, the difference between a Type 1 and a Type 2 changes both the fee and the calendar, and it is the first decision in the budget.
The three report types and what each changes
| Type 1 | Type 2 | Type 2 renewal | |
|---|---|---|---|
| What it covers | Control design at a date | Design and operating effectiveness over a period | Same, for a new period |
| Effectiveness testing | None | Sampled by the auditor | Sampled again, against controls already running |
| Typical calendar time once controls exist | Weeks | Three to twelve months, set by the observation period | Three to twelve months |
| Relative cost | Lowest | Highest first-year effort | Lower than a first Type 2 |
| When it makes sense | A deal needs a report now | A buyer requires proof of operation | Standard annual rhythm |
The cost drivers, line by line
These are typical market planning ranges, not quotes, and they move with scope, sector and vendor selection. Use them to size a budget, then get real numbers from two auditors.
| Cost driver | Typical planning range, first year | What moves it |
|---|---|---|
| Readiness and gap work | Roughly $10,000 to $40,000 | Whether you have policies and a control set, how much remediation is technical, whether you use a consultant, and how much of it you do internally |
| CPA firm examination fee | Roughly $12,000 to $45,000 | Number of criteria in scope, observation period length, system boundary size, first year versus renewal, and the firm's size and reputation |
| Tooling and infrastructure | Roughly $5,000 to $25,000 | A compliance automation platform, centralized logging and retention, SSO and MDM, vulnerability scanning, a vendor risk process |
| Internal time | Roughly 0.3 to 1.0 of a full-time person for the year | Who owns the program, how much engineering time remediation absorbs, and how manual evidence collection is |
Internal time is hours, not cash, so it is not in the total above. It is still the line that decides whether the project finishes on schedule.
How to read those ranges
Four observations about that table.
Readiness is often the largest single line, and the one you can reduce most by arriving at an auditor with a control set and a boundary diagram already in hand.
The auditor fee is not the price of compliance. It is the price of independent testing, and a cheap auditor in front of a broken control environment produces an expensive second attempt.
Tooling is optional and never sufficient. A platform that collects evidence from a control nobody operates collects evidence of nothing.
Internal time hides. It is not on an invoice, so it is not on the budget, and then it surfaces as a slipped roadmap.

Timeline, from decision to report
| Phase | Typical duration | What has to be true at the end |
|---|---|---|
| Scope and criteria selection | One to two weeks | System boundary agreed, criteria chosen, observation period dates set |
| Readiness and remediation | Six weeks to four months | Controls designed, policies approved, technical gaps closed |
| Observation period | Three to twelve months | Controls operating, evidence collected, exceptions logged and handled |
| Fieldwork | Three to eight weeks | Samples delivered, questions answered, draft report reviewed |
| Report issuance | One to three weeks | Opinion issued, report shared under NDA |
Add those ranges and a first Type 2 realistically runs six to twelve months from a standing start, assuming a company with decent existing hygiene and a three-month observation window. Take a twelve-month period and it runs longer, which is a scheduling decision rather than a cost one. A Type 1 can compress to weeks if controls exist, at the cost of proving nothing about operation.
The observation period is the part nobody can compress by spending money.
How many criteria you buy
Security is mandatory. Availability, Confidentiality, Processing Integrity and Privacy are optional and each one widens the examination.
| Scope | Effect on cost | Reasonable when |
|---|---|---|
| Security only | Baseline | Your buyer's questionnaire asks for Security and nothing else |
| Security and Availability | Moderate increase | You sell uptime commitments or host systems customers depend on operationally |
| Security, Availability and Confidentiality | Moderate increase again | B2B customers put proprietary data into your platform under contract |
| Adding Privacy | Largest single increment | You handle personal data and can evidence the full lifecycle |
Read your buyer's request literally. Scope is the one lever that changes both the fee and the timeline without changing anything about how good your security is, and it is worth settling before you agree to any criterion.

What "SOC 2 certification" actually gets you
People search for SOC 2 certification cost, and the honest answer is that the thing does not exist. There is no certifying body, no certificate, and no register to appear on. What exists is an attestation report issued by a licensed CPA firm under the AICPA's Trust Services Criteria, and what your buyer receives is that report, usually under NDA, usually as a PDF with an opinion on page one.
This matters for your budget. Certification schemes have fixed fees, published scopes and a defined renewal date. SOC 2 has none of those, which is why the same company can be quoted two very different numbers by two reputable firms. The fee tracks effort, and effort tracks scope. Anyone selling a fixed-price "SOC 2 certification" is either guessing at your scope or selling you something narrower than you think.
It also matters for how you describe yourself. Saying you are SOC 2 certified in a security questionnaire invites a follow-up you will not enjoy, because the reviewer knows the term is wrong and will wonder what else is imprecise. Say you have a SOC 2 Type 2 report covering a stated period, and name the criteria. It is more accurate and reads more confident.
What renewals cost
Year two is cheaper for three reasons: the control set is written, the evidence pipeline exists, and the auditor already knows the system. A common planning assumption is that a renewal lands somewhere around half to two thirds of the first-year total, provided nothing material changed.
What resets this is change. A major migration, a new product line outside the boundary, an acquisition or a new criterion added mid-cycle all mean new controls and new testing. Budget a line for change.
How this shows up on a board slide
Keep it to five lines, because a board will not read six.
- Requirement: which customer or contract is asking, and by when.
- Scope: the criteria claimed and the system boundary, in one sentence.
- Total year-one cost, with the four drivers visible underneath.
- Delivery date, driven by the observation period start date.
- Ongoing annual cost and the owner inside the company.
The number that matters to a board is not the audit fee. It is total cost of ownership, including the engineer who loses a fifth of their year to it.
Five ways this budget goes wrong
- Quoting the audit fee as the budget. The cheapest engagement is the one where the work was already done.
- Choosing an observation period by ambition. Three months of controls that are not ready is a three-month failure with a report attached.
- Buying tooling first. Software does not design a control environment; it records one.
- Scoping criteria nobody asked for. Every criterion is fee and time.
- No owner. A program with no named owner has no evidence pipeline, and the auditor's requests land on the busiest engineer.
Where this leaves you
Get your scope into one page: the system boundary, the criteria, and the observation period you can actually support. Send that page to two CPA firms and ask for a fee range against it. You will get comparable numbers instead of two guesses, and you will know what the readiness work has to deliver before the clock starts.
Trustalis supports SOC 2 readiness, control design, evidence preparation and coordination with your audit firm. We are not a CPA firm and we do not issue SOC 2 reports. The fee ranges above are typical market planning figures, not quotes, and the only number that counts is the one an auditor gives you for your scope.